Backhoe Loaders Archives - Utility Contractor Magazine

  • Business Educator 25 Zane | PDF | Hand | Bookbinding

    Business Educator 25 Zane - Free ebook download as PDF File (.pdf), Text File (.txt) or read book online for free. graphic design

    Learn More
  • Ragnar Benson Survival Poaching | PDF | Poaching | Crime

    A very serviceable .12 gauge shotgun can be made as follows: Purchase 2 feet of 3/4 inch pipe and another I foot section of one inch galvanized pipe. Also needed are 3 feet of 2x6 pine board, a 6 inch piece of 2x4 and a lot of electrical tape.

    Learn More
  • Safety with tyre fitting | WorkSafe.qld.gov.au

    Oct 25, 2017 · Safety with tyre fitting. Any industry that uses heavy vehicles faces the risk of workers being injured while fitting tyres. Problems frequently arise during work involving industrial type split rims, as used on earth moving machinery, trucks, forklifts and rural use vehicles, with both bolt together and lock ring type rims.

    Learn More
  • Project Announcements – Construction Advisor

    New regulations come into force on 13th May 2019 under the Code of Practice 2019 and the Electrical Safety (Solar Farms) Amendment Regulation 2019. 2019 Dates you should keep an eye on As 2019 gets underway and we all shake off our collective summer slumber, Construction Advisor wanted to bring together all of the important global

    Learn More
  • Construction - Mobile elevating work platforms health & safety

    The most significant MEWP dangers arise from operation and use of the machine rather than from their movement as a site vehicle. The law. [1] says that these hazards must be properly controlled. However, a safe workplace for all vehicle operations needs be established by separating pedestrians and vehicles and providing hazard-free traffic routes.

    Learn More
  • Contents Catalogue of Railway Group Standards What's New

    RAIL INDUSTRY STANDARDS NEW GMRT2400 Iss 3 December 2010 (A) Engineering Design of On-Track Machines This document defines the design requirements for features of ontrack machines which are not addressed by other Railway Group Standards. Supersedes GMRT2400 Iss 2 …

    Learn More
  • CODE OF PRACTICE

    1.11 In this Code sections 1 to 6 outline the general requirements and basic principles of load safety, and sections 7 to 18 provide advice. This advice is based on proven good practice, on the satisfactory methods for securing the more common types of load.

    Learn More
  • Code of Practice for Handling Servicable Rail with RRV

    Synopsis. This Code of Practice details the equipment and working practices for handling and thimbling of serviceable rail, using RRV excavator cranes, to minimise the risk to personnel and damage to the rail. These recommendations can also be used for handling scrap rail where the risk to personnel is the same as handling serviceable rail but the damage to the rail is not so critical.

    Learn More
  • Posts | Rail Engineer | Rail Technology and Engineering

    Feb 12, 2020 · Much of the rail mounted plant was supplied by Colas Rail including tampers, the track relaying machines (TRM) and the PEM/LEM equipment. Readypower supplied the road-rail vehicles (RRVs) and much of the other heavy plant. The project formed part of the South Rail Systems Alliance contract under the control of the Network Rail's Bristol office.

    Learn More
  • Posts | Rail Engineer | Rail Technology and Engineering

    The 11-day blockade began at 01:05 on 23 December, with the project's 13 engineering trains already stabled in Victoria station and the 13 RRV excavators and two RRV dozers at the RRAP. Small tools and geotextile were brought to site by the RRVs, the trains brought ballast and removed spoil, equivalent to 675 lorry movements.

    Learn More
  • On Site Solution | Safety Central | Page 11

    Manual Handling; Safety Hour; Business Critical Rules (BCR) Commitments, Rules and Policies. Close Call; Worksafe; Safety Vision and Lifesaving Rules; Data Protection and GDPR; Code of Business Ethics; Driving Safety; Construction, Design and Management (CDM) Principal Contractor Licensing (PCL) The Rule Book; On Site Solutions. Frontline

    Learn More
  • LG Water Cooled Package

    2 Water Cooled Package Air Conditioner Water Cooled Package Air Conditioner Owner's Manual TABLE OF CONTENTS FOR YOUR RECORDS Write the model and serial numbers here: Model # Serial # You can find them on a label on the side of each unit.

    Learn More
  • Emergency preparedness and first aid | WorkSafe.qld.gov.au

    Emergency preparedness and first aid. Rural properties must be prepared for emergencies. Being well prepared with emergency plans and equipment will ensure that the potential damage to people and property is minimised as much as possible. emergency plans and procedures are prepared and communicated to all workers and they are regularly updated

    Learn More
  • Track & Civil - ARTC - Australian Rail Track Corporation

    Adjust rail in accordance with safeworking and regulatory requirements and workplace procedures. It includes identifying and determining the requirements for rail adjustment, undertaking rail adjustment, and completing all required documentation. Ultrasonic Tester Track: Involves test plain rail and field welds using ultrasonic equipment.

    Learn More
  • Walker Safety Portal

    Manual Handling: B07 - HSE-CIS37 Handling heavy building blocks.pdf: Section B: E01 - COP0015 Iss 2 Load Lifting Points on Road Rail Excavator Cranes.pdf: Section E: M02 - Serco-Code of Practice for Contractors.doc: Miscellaneous: Client Supplied Documents: M02 - Serco-Safe working guide.doc

    Learn More
  • Code of Practice for Handling Serviceable Rail with Road

    Code of Practice for Handling Serviceable Rail with Road-Rail Excavator Cranes in Rail Mode Including Thimbling Synopsis. This Code of Practice details the arrangements for handling rail and thimbling with road-rail excavator cranes whilst in rail mode. Read full standard. Withdrawn

    Learn More
  • Managing risks in stevedoring - NT WorkSafe

    Codes of practice are admissible in court proceedings under the WHS Act and Regulations. Courts may regard a code of practice as evidence of what is known about a hazard, risk or control and may rely on the code in determining what is reasonably practicable in the circumstances to which the code relates.

    Learn More
  • BSD-Steel Guide 2013 | PDF | Structural Steel | Pipe

    Rolled Edge Stockyard Rail. Rolled Edge Stockyard Rail - 6.0m. Product Code. B-D-t mm mm mm. TSR 18516 TSR 18520. 185x19x1.6 185x19x2.0. Black kg/m. Galv kg/m. Product Code. B-D-t mm mm mm. 2.8511 2.9170 TSR 23516 235x19x1.6 3.5325 3.5978 TSR 23520 235x19x2.0 All details are correct at time of printing but may be subject to changes. 19. kg/m

    Learn More
  • eCFR :: 49 CFR Part 213 -- Track Safety Standards

    This subpart prescribes requirements for the gage, alinement, and surface of track, and the elevation of outer rails and speed limitations for curved track. § 213.53 Gage. ( a) Gage is measured between the heads of the rails at right-angles to the rails in a plane five …

    Learn More
  • i3P

    i3P is an innovative new platform that allows the brightest minds in infrastructure to collaborate to deliver infrastructure for the future.

    Learn More